Pre-Production Implementation of AD Schema Updates for Lync 2013

The Lync 2013 Project required testing of the Active Directory Schema changes before the changes were made into Production. My involvement included:

• Translating the high level objective (Implement AD Schema changes and see if it affects anything) into a low level implementation plan
• Designed implementation plan, including verification of each step’s success and roll-back plan
• Implemented AD Schema changes into non-production environment and verified successful implementation