The Lync 2013 Project required testing of the Active Directory Schema changes before the changes were made into Production. My involvement included:
• Translating the high level objective (Implement AD Schema changes and see if it affects anything) into a low level implementation plan
• Designed implementation plan, including verification of each step’s success and roll-back plan
• Implemented AD Schema changes into non-production environment and verified successful implementation